Primavera P6 XER forensic scheduling: AACE windows, TIA, impacted as-planned, DCMA-14, Monte Carlo.
Remote server: your requests and data go to mcp.criticalpathpartners.ca. Claude Code: claude mcp add --transport http critical-path-partners https://mcp.criticalpathpartners.ca/mcp · Claude app: Settings → Connectors → Add custom connector.
The tools this server listed when we connected to it, in its own words.
forensic_windows_analysis — Run forensic windows analysis (AACE RP 29R-03 §3.3, MIP 3.3 Observational / Dynamic / Contemporaneous As-Is) across multiple Primavera P6 XEconcurrent_delay_matrix — Build the per-window x per-party concurrent-delay attribution matrix from a chronological list of XER snapshots. Implements the per-window cwoet_classifier — Worked-vs-On-time Execution Timeline (WOET) per-activity day-by-day classification of as-built execution against baseline. For each pairableslip_velocity — Per-window slip velocity & acceleration trend across XER snapshots. Computes three signed metrics per window from the underlying forensic wicollapsed_as_built — Collapsed As-Built / But-For analysis on a post-impact XER. Implements AACE RP 29R-03 §3.8 Modeled / Subtractive / Single Simulation method time_impact_analysis_fragnet — Time Impact Analysis (TIA) — prospective fragnet insertion into a pre-impact baseline schedule. Supports two modes. **Single-base mode** (leimpacted_as_planned — Impacted As-Planned (IAP) on an unprogressed as-planned baseline. Implements AACE RP 29R-03 MIP 3.6 (Modeled / Additive / Single Base) and Scritical_path_validator — Critical-path validation, logic health, and DCMA-14 assessment of a Primavera P6 schedule. Runs the CPP critical-path validator: checks for dcma14_health_check — Full Schedule Health Dashboard HTML report — DCMA-14 + CPLI + BEI + variance/slip register against the baseline. Wraps the CPP Schedule Healpath_explorer — Logic-trace driver-chain explorer — answers "WHY is this activity critical?" and "WHAT does it drive?". Traces driving predecessors backwardmonte_carlo_p50_p80 — Monte Carlo Schedule Risk Analysis — P10/P50/P80/P90 completion-date forecast for a Primavera P6 schedule. Implements an AACE-style quantitaqramm_maturity — QRAMM-aligned maturity reading for an SRA result. Places a Schedule Risk Analysis run (from ``monte_carlo_p50_p80`` or any equivalent dict) claim_workbench_evidence_ledger — Forensic claim workbench — analyzes a folder of mixed evidence (XER chain + MSG/PDF/DOCX/XLSX correspondence) and produces a unified workbenxer_parser — Parse a Primavera P6 XER file and return a TABLE SUMMARY (not the full row-level data — XER row dumps explode the MCP context window). For eNot tested by KitScout yet. When our harness runs it, pros, cons and the tasks we tried appear here, with the date and evidence.