Categories › Data & Databases › Files, spreadsheets, CSV & PDFs
Saudi and regional energy data: registers, series, trackers, briefs; atlas layers need a member key.
Remote server: your requests and data go to renewablevision.com.sa. Claude Code: claude mcp add --transport http renewable-vision-energy-data https://renewablevision.com.sa/api/mcp · Claude app: Settings → Connectors → Add custom connector.
The tools this server listed when we connected to it, in its own words.
list_datasets — The catalogue of everything this platform publishes: each dataset with its id, title, topic, publisher, licence, coverage, record count, refget_register — Rows from one official Saudi register as this platform last mirrored it. register: sppc (Saudi Power Procurement Company, the Principal Buyesearch_projects — Match a name, developer, country, region or city across the project trackers and return the matching rows with their capacities, largest firget_company — One developer or shareholder named in the Saudi Renewables Tracker, by the slug on its page (acwa-power, masdar, edf-renewables, saudi-aramcget_series — One statistical series this platform mirrors from a publisher (the KAPSARC energy data portal, JODI, IRENA, the IMF, the IEA, the World Banklist_changes — Every row-level change this platform observed in an official register, a mirrored series or a tracker since a date, newest first, with the vwhats_due — The publications and milestones this platform expects next: each mirrored source with the date its refresh is due and how many days late it latest_brief — The current weekly energy brief: its subject, the figures it opens on, every block of its text and the permanent page for the week. Compiledget_brief — One week’s brief at its permanent address, by ISO week, e.g. 2026-W38. A brief never changes after the Sunday it was written, so it is safe list_briefs — Every weekly brief published, newest first, with its ISO week, the Sunday it covers up to, its subject in both languages and its page. Use ilist_reports — The report library: every report this company has filed, newest edition first, with its id, title, summary, scope, sector, edition, the dateget_report — One report at its permanent address: the caption as prose, the definitions of its headline figures quoted from its own notes, its sources, tpower_balance — Saudi renewable capacity operational, under construction and tendered, against the 2030 National Renewable Energy Program target and againstfleet_outlook — The week ahead for the tracked Saudi solar fleet: expected generation against the long-run normal, day by day, with the peak temperature foroil_balance — This platform’s oil balance model run on its live inputs: the lever set, a summary, and the monthly path of anchor, price, band, demand, supsolar_resource — The long-run (2001–2020) NASA POWER climatology for one 0.5° cell (about 55 km): global horizontal and direct normal irradiance in kWh/m²/dagcc_series — Annual country series for Saudi Arabia, the UAE, Oman, Qatar, Kuwait and Bahrain: installed solar, wind and renewable capacity (IRENA, MW); news_mentions — Recent headlines on Saudi and GCC energy (renewables, storage, hydrogen, power, oil and gas, water, data-centre power), gathered every threesearch — Ranked matches across the datasets, the mirrored series, the published insight articles and the tracked projects — the same index the site’sproject_output_estimate — Estimated annual generation (GWh) and capacity factor of solar projects in the Saudi tracker, the GCC tracker and the Saudi captive segment,equipment_trade — Imports into Saudi Arabia, the UAE, Oman, Qatar, Kuwait and Bahrain from 2015 of PV cells and modules, lithium-ion cells, wind turbines, stagcc_emissions — National greenhouse gas emissions of the six GCC states by year: Climate TRACE by sector (power, fossil-fuel-operations, manufacturing and ooil_outlook — This platform’s oil price and production strategy model: Brent today, the model’s monthly path for the next 24 months under current Saudi anoil_scenario — Runs one preset Saudi production path through the model and returns what it implies: Brent by month for 24 months and by year to 2050, Saudifind_projects — Search and filter the whole project index, the one the site’s assistant reads: the Saudi, captive, GCC, Regional and World Renewables Trackeaggregate_projects — Count projects, add up their stated capacity or their disclosed investment, grouped by country, place, stage, technology, sector, developer,get_project — Everything the site holds on one project, by its id from find_projects, search_projects or a project page (/data/projects/{id}), whichever ttracker_summary — A tracker’s headline figures as its own page prints them, with the date they are true as of, read exactly as the site’s assistant reads themNot tested by KitScout yet. When our harness runs it, pros, cons and the tasks we tried appear here, with the date and evidence.